PV Top project in Delingha
Introduction: The Delingha project belongs to the third batch of the China demonstration project. The project is located on the Qinghai-Tibet Plateau, with an average altitude of 3,050 meters and a minimum temperature of -27.9 ° C.
Solution: The project uses the centralized 1500V inverter and the integrated inverter / transformer system. It targets harsh high altitude environments, increases the degree of protection, and relies on advanced technology and stable operation to gain customer approval.
Meaning and value: Using state-of-the-art technology, it has been successfully applied to high altitude plateaus and harsh climate.